Employing the newly-devised Iran petroleum contracts (IPC) is crucial for enhancing recover of oil and gas from Iran`s reserves. said Deputy for Development and Engineering at the National Iranian Oil Company (NIOC). Gholamreza Manouchehri.
He said these deals oblige operators to develop the fields in a 20-year period and offer a specified amount of hydrocarbons at the end of every phase of the contract period.
He also said that the IPC can be adopted both for developed and undeveloped fields. saying that unfortunately drilling operations in Iran are 50% slower than international norms.
We have to admit that the era of cheap oil production is over which means advanced technologies must be employed for producing oil economically.
Tags Development Drilling Gholamreza Manouchehri International International News Agency Oil Production Production
Check Also
EIA: Surge in Iraqi Oil Exports to the US
Iraqi oil exports to the United States increased last week, according to the US Energy …