NIDC Drills 41 Oil. Gas Wells in 4 Months

According to Drilling Co. (NIDC)`&gt.NIDC. Mohammad Ale-Khamis. the deputy managing director of Drilling Co. (NIDC)`&gt.NIDC. said that the wells included appraisal as well as workover wells.

As he said. 29 of the wells were drilled in the fields operated by the National Iranian South Oil Company (NISOC). while 2 others were drilled in central fields. 3 in offshore fields. 3 were ordered by the Petroleum Engineering and Development Company (PEDEC) and 4 others were ordered by other companies in the country.

Totally. Drilling Co. (NIDC)`&gt.NIDC rigs drilled 50.929 meters of wells during the 4 months. he added. saying that 13 drilling rigs were currently operating in various offshore or onshore fields. 

About core

Check Also

Russian Tanker Sinks in Black Sea Spilling 4,300 Tonnes of Oil

A maritime disaster unfolded in the Black Sea when a Russian oil tanker dramatically split …

Leave a Reply

Your email address will not be published. Required fields are marked *