NIDC Drills 23 Oil, Gas Wells since March

The National Iranian Drilling Company (NIDC) has successfully drilled 23 oil and gas wells in the first two months of the current Iranian calendar year which began on March 20.

According to NIDC, Babak Zangeneh the company’s director of consolidated planning, said of the spudded wells, 12 were appraisal/development wells and 11 others were workover projects.

He said 19 wells were in the fields operated by the National Iranian South Oil Company (NISOC), 2 were in the fields operated by the Petroleum Engineering and Development Company (PEDEC) and one was drilled as a project and was ordered by other companies.

Mr. Zangeneh said during the period, 59 rigs belonging to NIDC operated in offshore and land projects, adding a total of 17,297 meters of well had been drilled since the beginning of the new Iranian calendar year.

NIDC possesses 70 offshore and onshore drilling rigs, he went on to add.

About Sheida Bahramirad

Check Also

OPEC Oil Production Jumps by 470,000 Bpd as Libyan Output Returns

The return of Libya’s oil production to full capacity raised the total OPEC output by …

Leave a Reply

Your email address will not be published. Required fields are marked *