Gazprom Neft Drills First Multi-Lateral Well in Russia

Gazprom Neft subsidiary Gazpromneft-Yamal has completed construction of Russia’s first-ever multi-lateral well with four horizontal cased-hole side tracks. at its Novoportovskoye field. A total 6.756 m was drilled. including 4.411 m drilled in the target strata. The well was constructed in 39 days at a rate of 5.78 days per 1.000 m.

Drilling horizontally branched wells facilitates a manifold increase in drainage from disjointed low-permeability strata. significantly increasing the oil recovery factor at productive strata and bringing marginal reserves into development without the need to drill additional wells. Russian-produced equipment was used in well construction. retooled in line with the specific geological conditions of Novoportovskoye field.

About core

Check Also

Gazprom Shut down Dozens of Natural Gas Wells ahead of Spring Floods

Russia’s natural gas giant Gazprom had to shut down more than two dozen producing wells …

Leave a Reply

Your email address will not be published. Required fields are marked *