Iran to Launch 4 Downstream Petchem Parks

The CEO of Petrol Co. said Urmia Melamine. Ilam Polypropylene. Melamine Crystal Park and Lordegan Resin Urea parks are planned to be built in Iran in the near future.

Rasoul Najafzadeh was quoted by SHANA as saying that Urmia Potassium Sulfate Unit would become operational by March with 400.000 tons year of production capacity.

He said Urmia Melamine Park was to be launched by the private sector and Petrol Co. would operate as the regulator of the project. The park will entail 6 facilities and would create 940 direct jobs with an investment of Rls. 7.400 billion.

Furthermore. Ilam Polypropylene Plant will be built with 150.000 tons of installed production capacity and will become operational by 2022.

This project will also entail 6 plants with an investment of 12.000 billion Iranian Rials.

About core

Check Also

Petrochemicals are Driving 90% of China’s Oil Demand Growth

Last year, Bloomberg caused quite a stir in energy circles when it predicted that global …

Leave a Reply

Your email address will not be published. Required fields are marked *