All Petrochemical Plants Operational Despite Turkmen Gas Halt

All Iran`s petrochemical facilities are operating and they have been faced with no shortages in feedstock supply despite Turkmenistan`s abrupt cutting of gas flow to northern Iranian provinces. said Ali Mohammad Bossaqzadeh. Director of Production Control at the National Petrochemical Company (NPT).
 
 
He said the National Iranian Gas Company is supplying all the gas needed by petrochemical plants in the country.
He said however that production at a few facilities is at its minimum due to dropped pressure in the national gas distribution network. 
Turkmenistan has cut its gas flow to Iran in an abrupt move one day after the two neighboring countries announced they had reached an agreement to continue their gas cooperation for at least 5 years. 
Turkmengaz. the national Turkmen gas company. has announced it halted the gas flow due to an arrears row that has lingered more than a decades between NIGC and Turkmengaz.
NIGC has ensured it gas supplied will not be disrupted for the household sector of the country.
Iran consumers 700 million cubic meters per day of gas while Turkmengza supplies an average of 10 mcm/d to northern provinces of Iran. 
 

About core

Check Also

Gazprom Cuts Gas to Austria off, just in Time for Winter

Russia’s Gazprom PJSC has decided to play its favorite game: pipeline politics. Starting November 16, …

Leave a Reply

Your email address will not be published. Required fields are marked *