The projct takes two years to be implemented. and and it needs six months to be handed over to the Iranian experts.
Read More »Iran Greets Cooperation between OPEC. Non-OPEC Countries for Maintaining Oil Market Stability
The project has faced repeated delays since it was conceived in the 1990s to connect Iran'.s South Pars gas field to Pakistan.
Read More »Iran to Accept No Inspection Outside IAEA Framework
Iran has conducted its enrichment activities in line with its long-term enrichment and R&.D enrichment plan.
Read More »Iran Says OPEC Compliance with Output Pact Increasing
Under the agreement OPEC is curbing its collective oil production by about 1.2 million bpd.
Read More »Iran’s Electricity Export Rise by 34 Percent
Iran plans to increase its nominal electricity generation capacity to 80.000 MW by summer 2018.
Read More »Iranian Ports Import. Export of 4.1 mln Tons of Oil Products
The country currently produces 513.500 tons of crude oil per day of which 230.000 tons are refined.
Read More »Foreign Companies Eager to Invest in Iran’s Oil and Gas Industry
There is intense competition across the world to attract foreign investment. but the assets are limited while competition for absorbing them is high.
Read More »Eni Talks on Oil&gas Projects in Iran
The Kish gas field is expected to yield 28 million cubic meters per day of gas. to be used domestically. and 11.300 bpd of gas condensate set for export.
Read More »Iran Increase Exports of Gas Condensate by 18 Percent
South Pars gas field which is located in the Persian Gulf hosts the bulk of Iran’s natural gas reserves.
Read More »Long Term Solar Energy Storage System in Qazvin
Government data show the share of renewables in Iran’s energy basket is 240 megawatts at present. which is less than 1% of total installed power generation capacity of 77.000 MW.
Read More »